The Challenge
- The existing façade had been coated with a cheap waterproof coating as the building suffered from leaks due to poor detailing.
- Parts of the building overhang the Thames so access was difficult.
- The building had a stepped design, with many roof terraces so scaffold design and calculations were key.
- Works were very intrusive to residents.