THE CHALLENGE

  • Having to rectify a previous contractors works leaving the customer with non-compliant fire doors and with inadequate fire stopping.

  • Carrying out works while 800 rooms were fully occupied.

  • Salvaging previously installed doors to avoid the need for full replacement.

WHAT WE DID

  • Carried out remedial works to 800 doors while causing minimal disruption to residents.

  • All repairs were carried out to BM TRADA recommendations.

  • To achieve the minimum 2-4mm gaps around the door leaf to the frame we needed to remove architraves and adjust frames while making sure fire stopping was not compromised.

  • Reinstalled intumescent smoke seals previously incorrectly installed and where adjusted threshold gaps throughout the project.

WHY WAS IT A SUCCESS

  • All doors were able to be salvaged and all repairs were assessed and deemed satisfactory within the fire risk assessment.

  • The project was delivered within budget and within the requested time frame.

AS Ramsay were highly skilled in all their fire door repair works.

Alan Roberts | Preston Barracks Project Manager